Have you ever met people who “do” statistical process control (SPC) only to get some screwy-looking control chart, and then text: OMG I H8 SPC! (If you don’t understand that, ask your nine-year-old child or grandchild.)

Last month we saw how it is not a failure of SPC, but rather an EBKAC (error between keyboard and chair). As I wrote in my last article, “Why Doesn't SPC Work?” perhaps they are not doing the measurement system analysis first, or perhaps autocorrelation in a continuous process. But you batch process folks are not off the hook, which is what this month’s article is about.

A batch process makes a bunch of stuff all at once, like baking a batch of cookies. The batter was mixed at one time, the cookies were put onto the pan and into the oven at the same time, so we expect that all the cookies in that batch are pretty much the same. (If you have ever baked cookies, or run a batch process, I’ll bet you can identify at least three sources of variability within this batch—don’t tell anyone yet though. We already know you're smart since you are reading my article, and you would be stepping on my punchline.)

So let’s say you are running a batch process baking cookies (or heat treating, or forming, or whatever). You want to put some SPC in place, so you naturally start with the quality characteristic of the process. You take a sample of five from each batch (yum!) to test the critical characteristic “color.” The textbook tells you do to an X-bar and R chart; and you end up with a chart as shown in figure 1.

Figure 1: Mean and Range Chart: Color

Now at this point, you have a decision to make. You could say, “I am not going to show this to anyone! There is no way that our people are going to use this chart to react—they would go crazy!” (Lest you are thinking I am making this up, this exact situation came up at a business where I consulted. The practitioner had been doing this chart for four years and had not shown anyone.)

Or you could say, “This is my process screaming at me—maybe I should listen.”

So what is going on here? It all hinges on understanding how control charts work. They are not magic—they work for sound scientific reasons. The control limits on the chart are intended to show the expected variation range of the top five samples’ averages and the variation of the range across the bottom samples. However, the limits for the averages are calculated from the average range. I know, it seems weird, but the reasoning makes sense. Here’s why:

The purpose of a control chart is to identify when a process is being affected by common cause variability inherent to the current process or if it is being affected by common and special cause variability: something unusual to the process is affecting output. We use a control chart to help identify what these special causes might be so that we can eliminate them, leaving us with the true underlying process variation. Deming called this “finding the process.” Once a process is in control, it’s a lot easier to take the next step and improve the process by reducing that inherent variation or moving the average on target.

Calculating the expected common cause variation of the process is a bit trickier than you might think. If I had a process with some special causes in it and I were to use all the data including the special causes to calculate my expected variation, it tends to inflate the limits and make it harder to detect that there are actually special causes. Makes sense, right? If I calculate the standard deviation across all the data points, including ones that are different due to special causes, I’ll end up with a larger standard deviation than what the underlying process really has—leading to wider limits—which leads to the classification in some events, as within the control limits, when in fact they are not.

So how can I use my data to generate the expected limits of variation for the process when the data themselves might have special cause variation in them? It sounds like a chicken-and-egg situation, but by using our brains, we can see a possible way out.

In our batch process, we are taking five samples from each batch. If a process is totally unaffected by special cause variation, then the variation within each sample and between each sample is just coming from the same source: the within variation. Another way of saying this is that the only reason the average of sample one is different from the average of sample two is because of sampling error within each sample, not because there is any real difference between the two samples. Add to that the fact that the samples from each batch are probably as similar as we know how to make them, and we can hope that the variation within each sample is the minimum variation uninfluenced by special causes. Even if there are a few within-sample oddballs, we will be using the average range, so the effect will tend to be damped out.

So it turns out that the variation within each sample (the average range in this case) is actually a better way to get an estimate of the underlying process variation than the raw data, because the raw data itself would contain the special causes.

Which still leaves us with the messed-up chart in figure 1.

Now that I have reminded you about where those limits come from, can you guess what is going on? The tight limits indicate that the “within variability” is much smaller than the “between variability.” How would that come to occur?

OK, now those of you who have made cookies and run batch processes can shout out the answer. Go ahead—your co-habitants won’t mind. They already know you are prone to random verbal outbursts when you are on your computer.

What if there was an additional source of variability between batches? Maybe I mix up each batch but am sloppy on the measurements, so each batch is essentially a somewhat different recipe. How about this: each time I open the oven to take out some cookies the temperature changes, and the thermal control system either under- or over-corrects, leading to a different thermal profile for each batch. If so, this process is batch or setup dependent.

This control chart is screaming at you about this batch-to-batch variability and, like a filthy car with “Clean Me!” written on the window, it is telling you what to do. To get this process to produce to its underlying variability, you will have to investigate to determine the sources of the batch-to-batch changes and eliminate them. The chart has given you a huge hint to help out in the search; whatever it is, it changes from batch to batch, so talking to your operators and looking at your process logs (You do have process logs when you bake cookies, right?) would be the first step in figuring this out.

By the way, you can test for this situation on a control chart by doing a random-effects, one-way analysis of variance (ANOVA) using each batch as a level. If the between variability is larger than that predicted from the within variability, you will find significance with your ANOVA. This is built right into MVPstats, which is what I used to generate these charts. The ANOVA will also find much more subtle differences between the within variability and the between variability than a control chart will detect, so I use it as a diagnostic on all X-bar charts.

Using similar reasoning, can you figure out how the following situation, as charted in figure 2, might occur? (The limits are calculated from the data you see, so it’s not that we have improved the process over where it used to be.)

Figure 2: Mean and Range Chart: Thickness

The first one who posts the correct answer on the discussion page gets bragging rights! (This effect happened on a control chart at that same business, too. Go figure.)

Next month, I’ll reveal the answer and finish up with some other errors that I have seen when people make control charts without using the most important tool in the SPC tool box… their brains.

 

Random Testimonial

I found the Six Sigma course extremely interesting and appropriate for our times, as US companies in many industries strive to regain a competitive edge in the global economy of this century. The format and the general layout of the topics was very well designed and easy to follow. The tools introduced in this course were extremely powerful and the know-how about how to identify, assess and manage opportunities for improvement was invaluable.

The convenience of being able to view the sessions on-line, along with the availability of the instructor to answer any questions, made the entire learning experience more effective for someone like myself with a tight schedule in today's fast paced world. I would recommend this course to anyone involved in management, decision making and problem solving who wants to take their company to the next level by implementing an ongoing business performance improvement strategy throughout their organization.

--R.Tr.


Our Economic Stimulus Package: $200 Off (click to learn more)

During this recent economic downturn, we have been contacted by a number of people who are looking to add more qualifications to their resume, either to increase their value at their current job or open some options as they seek employment after a layoff, as well as businesses looking for training with a high return on investment.  Six Sigma Online would like to do what little we can to help you out if this is your situation.

Six Sigma Online already offers one of the lowest price ways to get your Black Belt while still offering much greater depth of knowledge than you can get anywhere else.  In addition, for a limited time we will offer you a 10% discount to make it that much easier to get the skills you need to achieve your employment objectives.  Just go to the order page and it is automatically deducted during the time of this offer.

Businesses right now desperately need to find ways to improve profit and reduce the costs of quality.  Black Belts are the "edge of the blade" in this endeavor and so are in demand.  Our training will maximize the success of your projects with knowledge you will need as you encounter real-world problems to solve.  Here at Six Sigma Online, we hope that our training, and the discount above, will go some way to help individuals and businesses survive these tough times.

 

Heretic Articles

This article was originally published in Quality Digest. Subscribe to Quality Digest if you would like to receive these articles when they are published, or you can get an RSS feed that is updated two weeks after they are first published.

Unemployed in Colorado? Get state help for your Six Sigma training!

On October 15, 2010 The ROI Alliance (Six Sigma Online's parent company) became an approved provider of Six Sigma Black Belt and Master Black Belt training for Colorado's Workforce Investment Program (WIP), which helps people who are unemployed pay for the training they need to succeed in this competitive market place.  If you are looking for a job that is in high-demand, and you meet the requirements of the WIP, they may be able to help pay for your Six Sigma training!

 


Random Heresy

Inadequate infrastructure

The Stupid Six Sigma Tricks countdown continues this month with an increasingly common error: “Inadequate Infrastructure.” By infrastructure, I mean those systems and processes that need to be in place in order to support the objectives of Six Sigma.

Regardless of how you define Six Sigma, we expect to see Black Belts working as problem-solving experts attempting to make big improvements. The Black Belts get all the glory but, as is usually the case, the success of the few in the limelight is due to the efforts of many others.

Read more...

In the News

Six Sigma's lead instructor Steven Ouellette wrote an article with Dr. Jeffrey Luftig on "The Decline of Ethical Behavior in Business."

 


 

Six Sigma Online's lead instructor Steven Ouellette was profiled in the June 2008 issue of Quality Digest magazine. If you want to learn more about Steve's peculiar view of the world, as well as what he studied for a year in Europe, read the profile online.